GC-52A
Aerial view of the jacket structure in the water
Top Deck being placed on the barge
GC52A to GC52CPP bridge being removed
Workers on the flare tower during removal prep
Conductors on Deck
Conductor after top cuts
GC-52CPP
Barge positioned alongside the GC52CPP platform
GC52CPP deck being removed
GC52CPP Quarters being removed
GC52CPP Quarters being removed
GC52CPP deck being placed on the barge
Aerial view of the CPP platform after GC52A removal
Aerial view of the CPP platform after GC52A removal
GC52CPP East Module being placed on the barge
GC52CPP East Module Removal
View of GC52CPP after East Module Removal
View of GC52CPP deck being lifted
GC-184, Jolliet TLWP
TLWP undergoing draft adjustment
Draft adjustment in progress, water spraying at column bases
Helideck close-up
Aerial close-up of deck with hydraulic workover unit
Ground-level view of hydraulic workover unit on deck
Directly overhead aerial of entire TLWP deck
TLWP approaching the port
TLWP being maneuvered into the port harbor
TLWP being docked at the port industrial facility
TLWP docked at port, another angle
Three tugs towing the TLWP
Tendons being transferred on a vessel deck
TLWP under tow
Last riser being prepped for removal
Tensioners after cutting riser clamps
Marine Growth on Riser connected to Tensioner